Rubber CalenderHOME >> Products >> Rubber Calender >>

Three- Four Roll Rubber/ Plastic Calender Machine for Extruding and Calendering

China Hot Sale Three Roll Rubber Calender,Xyi-450X1400 Rubber Calender and Extruder Machine for Rubber Sheet Extruding and Calendering

Rubber calendering machine is mainly used for:

Textile (cloth, canvas, etc.) of glue and eraser; steel cord adhesive; rubber compression and pressure type; cord attached to the fit of the isolation film and multilayer film.

Configuration 

1. Rolls: Chilled Alloy Cast Iron rolls with surface hardness 68~72HS. The Rolls are mirror finished & polished, duly grinded and are hollowed for cooling or heating.

2. Roll Clearance Adjusting Unit: Nip adjustment at two roller ends is done manually using two separate screws attached to the brass housing body.

3. Roll Cooling: Universal Rotary joints with inner Spray pipes with Hoses and Headers. Piping is complete up to supply pipe terminal.

4. Journal Bearing Housing: Heavy Duty Steel Casting Housing fitted with Anti Friction Roller Bearings.

5. Lubrication: Full Automatic Grease lubrication pump for Anti Friction Roller Bearings fitted in dust sealed housing.

6. Stand Frame & Apron: Heavy Duty Steel Casting.

7. Gearbox: Hard-tooth reduction gearbox, GuoMao brand.

8. Base Frame: Common base frame heavy duty, Steel channel and MS plate fabricated accurately machined on which whole machine with Gearbox and motor are fitted.

9. Electric Panel: Star Delta Electric operating panel with Auto Reversing, Voltmeter, Ampere, Overload protection relay, 3 Phase Indicator and Emergency Stop Switch.


Parameter/model XY-3-250 XY-3-360 XY-3-400 XY-3-450 XY-3-560 XY-3-610 XY-3-810
Roll diameter(mm) 250 360 400 450 560 610 810
Roll working length (mm) 720 1120 1200 1400 1650 1730 2130
Ratio of rubber speed 1:1 1:1 1:1 1:1.5:1 1:1.5:1 1:1.4:1 1:1:1
Roll speed (m/min) 2-15.9 3-20 3-26 2.6-26.2 3-30 5.4-54 3-30
Nip adjust range (mm) 0-6 0-10 0-10 0-10 0-15 0.5-25 0.2-25
Motor power (KW) 22 45 55 75 110 160 132x3
Weight (KG) 5500 14000 18000 21000 35000 42000 110000





Salient Features

  1. Electric heating system, even temperature spread along the roll
  2. Chrome plated surface, no split-off
  3. Adjustable gap, variable sampling thickness
  4. Revers jog rotating
  5. If dual inverter & motor is equipped, the two roll mill can has any speed ratio for different mixing purposes
  6. High precision PID temperature controller with PLC control
  7. Protection cover on roller top
  8. Emergency safety switch at knee level
  9. Emergence locking switch on control panel
  10. Touch screen graphic user interface
  11. Variable speed control with frequency inverter
  12. Optional the same speed of the two rolls
  13. Optional oil heating system



Services Commitment
1. Our engineers can design target machines for you and send the drawing to confirm.
2. In the process of production, we will take photos and send to customers for you tracking.
3. Documents such as packing list, commercial invoice, and bill of lading etc. will be sent after the delivery.
4. We could supply free English foundation DWG, installation drawing, user guide, maintenance manual and part drawing.
5. We supply overseas technical support
6.Test Machine Before Delivery, you only need to connect the wires to the outside the control cabinet.

FAQ 
1. Delivery time of the rubber machines?
This is specially designed machine according to your specific requirement.
From engineer designing to production completion, it needs about 25 to 35 days.

2. What does your factory do regarding quality control?
We pay much more importance to quality control from the very beginning to the end of production.
Every machine will be fully assembled and carefully tested before shipment.

3. What''''s the machine quality guarantee? 
Quality guarantee time is one year.We choose world famous brand components to keep our machine in perfect working condition.

4. Are you able to give installation and commissioning overseas? How long time will it take?
Yes, we can supply overseas service and technical support but customer needs to pay for the cost of the installation.
Small machine usually takes within 2~3 days.
Big plant usually takes about 30 days.

5. How can I trust you to deliver the right machine as I ordered?
We will absolutely deliver a good quality machine as we discussed and confirmed in the order.
The core of our company culture is innovation,quality,integrity and efficiency. Also we have had many good cooperation with world famous rubber production manufacturers. If you come to our factory, we can show you''''re the user around us.

6. How can we go to your side?
We are located in Qingdao City, Shandong province, China. The name of airport is Qingdao liuting airport.
We will pick up you at the airport.


Online Message